Navigation
Rigg Construction
Call us on 01225 705 668

Rigg Construction (Southern) Ltd
Lancaster House
Lancaster Park
Bowerhill
Melksham
SN12 6TT
Tel: 01225 705668
Fax: 01225 790069

Send us a message

Find us on Google

Find us on LinkedIn

Winner of LABC West of England Building Excellence Award 2018 - Small New Housing Development

Recent Projects

Rigg Construction specialise in all aspects of construction across a range of sectors. View some of our case studies here.

Fessey House, Swindon

Fessey House, Swindon

Design and build of 28 Bedroom Extension to existing Care Home, together with phased refurbishment of existing building and associated external works.

Download Case Study

New Reception and Catering Facilities, Bath College

New Reception and Catering Facilities, Bath College

The project comprised of the Design and Construction of a New Main Entrance, Reception, Production Kitchen, Bar and Fine Dining Facility and Toilets for City of Bath College.

Download Case Study

Barton Hill Phase 1 - Marlborough College

Barton Hill Phase 1 - Marlborough College

Rigg Construction worked closely with Marlborough College and Kendall Kingscott throughout the summer of 2022 to replace and refurbish existing windows, install new roof coverings, replace damaged tile hang and install new timber cladding.

Download Case Study

Berryfield Village Hall, Melksham

Berryfield Village Hall, Melksham

New build single storey building comprising; main hall (with operable wall to divide space when required) with adjoining storage spaces.

Download Case Study

Ailesbury Court, Malborough, Wiltshire

Ailesbury Court, Malborough, Wiltshire

Rigg Construction were appointed by Porter Property fund to convert and refurbish Phase II of a large existing office block that extended into the High Street in Marlborough into luxury flats.

Download Case Study

New Highways Depot, Warminster

New Highways Depot, Warminster

Construction of steel-framed Salt Barn and Vehicle Servicing and storage facility for Wiltshire Council Highways Department.

Download Case Study

Westmead, Chippenham

Westmead, Chippenham

Construction of new activity centre comprising Climbing Centre, Viewing Gallery, Cafeteria, Classroom, Welfare & Changing Facilities, Skate Park, Extensive Car Parking and associated external works.

Download Case Study

Tesco Express, Bridgwater

Tesco Express, Bridgwater

Design and build of 2 steel frame retail units, one for a Tesco Express and one fast-food outlet.

Download Case Study

Hillarys Blinds, Cheltenham

Hillarys Blinds, Cheltenham

Construction of a new 139 sq m 1,500 sq ft retail unit shell and associated external works plus provision of additional parking.

Download Case Study

Costa Coffee, Barnstaple

Costa Coffee, Barnstaple

Construction of a new 167 sq m 1,800 sq ft retail unit shell and associated external works.

Download Case Study

Pilgrims Close, Swindon

Pilgrims Close, Swindon

Design and build of 14 new bungalows for sale on open the market.

Download Case Study

New Local Centre, Old Sarum

New Local Centre, Old Sarum

This was a Design and Build Contract which also included car parking facilities and landscaping with a new residential estate in Old Sarum.

Download Case Study

Ashton Keynes Primary School

Ashton Keynes Primary School

New 3 class extension and atrium library, with extensive refurbishment/alterations to existing school.

Download Case Study

Corsham Broadwood

Corsham Broadwood

Design and construction of new single storey 6 class block with group rooms, SEN Resource, office space, WCs and associated external works.

Download Case Study

Princecroft

Princecroft

New School Hall with Vaulted Glulam Roof Structure, procured under JCT Design and Build Contract. Re-modelling and refurbishment of existing school

Download Case Study

Winterslow Road

Winterslow Road

Design and construction of 14 new high quality affordable homes using timber frame with brick façade, UPVC windows and smooth grey concrete tiled roofs.

Download Case Study

Herman Miller

Herman Miller

Internal reconfiguration to provide new office and design spaces from existing warehouse. Extension and amendment of external parking areas.

Download Case Study

Swindon New Townhouses

Swindon New Townhouses

The design and construction of 7 new 3-bed terraced homes for Swindon Borough Council. The project was in a heavily built up residential area with access restrictions, requiring good planning and organisation to ensure project delivery.

Download Case Study

New Home for the Wiltshire Air Ambulance

New Home for the Wiltshire Air Ambulance

The Design and Construction of a New Headquarters for the Wiltshire Air Ambulance Charitable Trust including administrative office space, operational offices, multi-functional training facilities and associated ancillary spaces.

Download Case Study

Ludgershall Castle Primary School

Ludgershall Castle Primary School

Construction of two storey rear and side classroom extension with a single storey front extension to create an entrance lobby, and also the construction of a new car park.

Download Case Study

New Dance Studio - Sheldon School

New Dance Studio - Sheldon School

Design and Construction on a ‘live’ school site, of a new flat roofed, single storey teaching block providing a dance studio, classroom, office, lobby, changing rooms, WCs, plant rooms and stores at the school campus in Chippenham, Wiltshire.

Download Case Study

Rowde, Devizes - 6 Bungalows for Wiltshire Council

Rowde, Devizes - 6 Bungalows for Wiltshire Council

Development of 6 bungalows for Wiltshire Council making use of existing tenanted farmland to provide assisted living housing for local villagers.

Download Case Study

Two new single storey dwellings, East Knoyle, Wilts

Two new single storey dwellings, East Knoyle, Wilts

This was a development of 2 bungalows for Wiltshire Council making use of redundant land to provide assisted living housing for local villagers.

Download Case Study

Orchard Corner, Wedmore - Passive House

Orchard Corner, Wedmore - Passive House

This low energy executive Passive House (Passivhaus) house with double garage, was constructed using a ‘fabric-first’ approach, high thermal performance cavity walls, tiled roof and triple pane double low-e glazing.

Download Case Study

Townsend House

Townsend House

Conversion and refurbishment of 15 flats at Townsend House, Bath Road Swindon for Swindon Borough Council

Download Case Study

Blenheim House

Blenheim House

Design and Construction of a New 32 bedroom annex to care home in Melksham Wiltshire.

Download Case Study

Rygor Commercial Showroom

Rygor Commercial Showroom

Construction of a new Mercedes-Benz commercial vehicle sales showroom and servicing workshops together with extensive external drainage and hard landscaping works.

Download Case Study

Amesbury School

Amesbury School

Construction of 4 classroom extension on a sloping site including ICT Suite and Nurture room, New Toilet facilities, ramped corridors, Plant Room, Lobby with roof lantern, External Works including Drainage and Soakaways, new access road and parking, paved areas and landscaping.

Download Case Study

Wiltshire School of Gymnastics

Wiltshire School of Gymnastics

Steel framed extension to existing Gymnastics Hall with associated alterations to the existing building, external works and drainage. The extension involved pad foundations & ground beams linking it to the existing structure with a combination of ground bearing and suspended concrete floor slab construction.

Download Case Study

Whiteparish Memorial Hall, Salisbury

Whiteparish Memorial Hall, Salisbury

The works consisted of the demolition of the existing cricket pavilion and the construction of a much needed new multifunctional Community Centre.

Download Case Study

The Mews - Wells Cottage Hospital

The Mews - Wells Cottage Hospital

Conversion of Victorian Hospital Building and Construction of New Executive style three storey townhouses over 4 phases.

Download Case Study

Sandroyd School - New Gymnasium

Sandroyd School - New Gymnasium

Demolition of the existing Gym Hall and construction of new Triple Storey Height, Brick and Steel Framed Gymnasium and Sports Hall, together with the construction of a new entrance and foyer area, serving both the Gymnasium and existing enclosed Pool complex.

Download Case Study

Holt Primary School - New Classroom Block

Holt Primary School - New Classroom Block

Design and Build Contract for New two classroom extension with group room, toilets and link together with associated externals including replacement hard play area and demolition and removal of temporary units and part demolition and rebuild of existing school in a live environment.

Download Case Study

Caffe Nero - New Unit

Caffe Nero - New Unit

Construction of a new 139 sq m 1,500 sq ft retail unit shell and associated external works. This was a Design and Build Contract. The works consisted of phasing of car parking facilities, and the formation of a new café unit shell within a confined area of the existing Gallagher Retail Park.

Download Case Study

Appleford School - teaching and accommodation

Appleford School - teaching and accommodation

Construction of two storey multipurpose accommodation block with 5 classrooms including Home Economics Classroom, new Toilet facilities, plant room and circulation area to ground floor, and bedrooms with en-suite facilities.

Download Case Study


Have a Tender Enquiry?

Contact Rigg Construction to find out more about our work.

Send us a Message

Safe Contractor
ISO 9001 registered firm
Constructionline
NHBC registered company
ISO 14001 registered firm
The Contractors Health and Safety Assessment Scheme